SFC Loddon Backwater 2 Sept 2021

The site before commencemnt of works. The main River Loddon is just to the left of the picture.

SFC Loddon Backwater 2 Sept 2021

Lower section of the river bank that slopes down to the river to the left of the picture. The new backwater mouth will be in the center of this picture

SFC Loddon Backwater 2 Sept 2021

Accumulated silt which will be removed at the mouth of the backwater. This is before coomencemnt of works and at normal river levels.

SFC Loddon Backwater 2 Sept 2021

Preparing the ground with 14t excavator.

SFC Loddon Backwater 2 Sept 2021

Working backwards from the mouth of the new backwater in sections. Each section was dug out and finished whilst the temporary "Dam" held the water back. The river water was let in gently to each section by removing the dam. This was done to prevent a large influx of water at the final stage.

SFC Loddon Backwater 2 Sept 2021

Three 9t dumpers were used over two days to tensport the spoil to a different onsite location

SFC Loddon Backwater 2 Sept 2021

A completed and flooded section, ready for the next to be dug.

SFC Loddon Backwater 2 Sept 2021

View looking up from the backwater mouth.

SFC Loddon Backwater 2 Sept 2021

Complete. Just need mother nature to do the rest.

SFC Loddon Backwater 2 Sept 2021

Excavated spoil. This was used on a different part of the site out of the flood plain as part of the construction of the Farley Hill Horse Trails event course. This was made into a mound and left to dry and settle for twelve months and finally used in the Horse Trials in June 2022.

 